Repairs to Swayze Falls Bridge

Work on repairing the Palaeozoic Path and the removal of the failed bridge upstream of the falls will be happening this Friday and Saturday (January 20/21, 2023).

The Roland Rd parking lot is closed as of January 18 as they are bringing in material and equipment in preparation. Sorry for any inconvience.

%d bloggers like this: